Shallow Rail Unloading

Date 2008/10/15 21:00:00 | Topic: Projects

Millcreek Engineering Company in Collaboration with Benetech USA has developed a Shallow Rail Unloading System.
21 North Design Services, LLC(21NDS) participated in the development of the Shallow Rail Unloading System. 21NDS modeled and ran the Shallow Rail Unloading System through material flowability physics tests, and determined the optimum configuration for the system.


The Shallow Rail Unloading System has been developed for locations that require a shallow pit for rail unloading such as those with a high water table.

For more information, please contact any of the three above companies.

Copyright 2009 - www.21nds.com
All Rights Reserved




This article comes from 21 North Design Services, LLC
http://www.21nds.com

The URL for this story is:
http://www.21nds.com/modules/news/article.php?storyid=2