Register now on 21nds.com!    Login  
HOME SERVICES PROJECTS NEWS CONTACT US


Projects : Shallow Rail Unloading
Posted by 21nds on 2008/10/15 21:00:00 (4577 reads)
Projects

Millcreek Engineering Company in Collaboration with Benetech USA has developed a Shallow Rail Unloading System.

21 North Design Services, LLC(21NDS) participated in the development of the Shallow Rail Unloading System. 21NDS modeled and ran the Shallow Rail Unloading System through material flowability physics tests, and determined the optimum configuration for the system.


The Shallow Rail Unloading System has been developed for locations that require a shallow pit for rail unloading such as those with a high water table.

For more information, please contact any of the three above companies.

Copyright 2009 - www.21nds.com
All Rights Reserved



Other articles
2020/3/10 21:50:00 - Engineering Companies prepare for COVID-19
2020/3/10 21:44:44 - Commercial Project: Firestation Property
2009/3/10 20:50:00 - Process Piping Design
2008/12/30 21:30:00 - Live Flow Animation
2008/12/16 18:10:00 - Temporary Train Loadout
2008/11/4 13:10:00 - Truck Dump and Unit Train Loadout Project
2008/10/15 21:00:00 - Shallow Rail Unloading
2008/10/10 3:50:00 - Facility Layout, PRB Coal
2007/8/10 19:10:00 - PRB Coal Chutework Design Project

The comments are owned by the poster. We aren't responsible for their content.





Copyright 2009 by www.21nds.com  |  Powered by XOOPS 2.0 © 2001-2008 The XOOPS Project  |  Design by 7dana.com