Millcreek Engineering Company in Collaboration with Benetech USA has developed a Shallow Rail Unloading System.
21 North Design Services, LLC(21NDS) participated in the development of the Shallow Rail Unloading System. 21NDS modeled and ran the Shallow Rail Unloading System through material flowability physics tests, and determined the optimum configuration for the system.
The Shallow Rail Unloading System has been developed for locations that require a shallow pit for rail unloading such as those with a high water table.
For more information, please contact any of the three above companies.
|