Temporary Train Loadout

Date 2008/12/16 18:10:00 | Topic: Projects

Benetech USA and Millcreek Engineering Company - Temporary Train Loadout
21 North Design Services, LLC (21NDS) was contracted by Millcreek Engineering Company to design a temporary train loadout facility for the client, while a new Truck Dump and Unit Train Loadout was being designed and constructed. 21NDS provided the Facility Layout Drawings, Foundation Drawings, Structural Design Drawings, and Renderings.



Links:
Benetech USA http://www.benetechusa.com/

Copyright 2009 - www.21nds.com
All Rights Reserved




This article comes from 21 North Design Services, LLC
http://www.21nds.com

The URL for this story is:
http://www.21nds.com/modules/news/article.php?storyid=5