Projects : Facility Layout, PRB Coal
Posted by 21nds on 2008/10/10 3:50:00 (9484 reads)

21 North Design Services, LLC completed a PRB Coal, Facility Layout contract.

The project included a shallow rail unloading machine, four overland transfer conveyors, a radial stacking conveyor, and three radial pile reclaim machines. The system feeds into the existing feed system, and will provide the necessary requirements to efficiently blend Eastern and PRB coal.



Open in new window



Other articles
2020/3/10 21:50:00 - Engineering Companies prepare for COVID-19
2020/3/10 21:44:44 - Commercial Project: Firestation Property
2009/3/10 20:50:00 - Process Piping Design
2008/12/30 21:30:00 - Live Flow Animation
2008/12/16 18:10:00 - Temporary Train Loadout
2008/11/4 13:10:00 - Truck Dump and Unit Train Loadout Project
2008/10/15 21:00:00 - Shallow Rail Unloading
2008/10/10 3:50:00 - Facility Layout, PRB Coal
2007/8/10 19:10:00 - PRB Coal Chutework Design Project

The comments are owned by the poster. We aren't responsible for their content.





Copyright 2009 by www.21nds.com  |  Powered by XOOPS 2.0 © 2001-2008 The XOOPS Project  |  Design by 7dana.com